Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 2695

Re: BreakDown Maintenance Spare Parts Issue

$
0
0

Hello Vikas.

Replying to your Last paragraph:

 

What we are speaking here in about the things you do in the system for your situation. (Not about the things you do while repairs on the shop floor).

  • Let's suppose that the small spare part you are talking about is a Bearing.
  • You need not do anything like Dismantling-Installing etc in the system, if this bearing is not listed in your system.
  • Dismantling-Installing is relevant only when it is Serialized material and mapped as Equipment.
  • If it is not so and it is a component in some BOM, then too you need not do any changes to this BOM.
  • In the BOM case, only thing you need to do is to mention this Bearing in the Components tab of the Order you create for the repairs.
  • This gives you a Reservation number in the Components tab.
  • You will then consume this through MIGO by specifying the Reservation no. with mvttyp261.


Scrap

  • What you do actually to scrap-materials in the system is entirely different issue.
  • There will be different practices in different Organizations based on the material of scrap (Ferrous, Non Ferrous etc).
  • Few Organizations Recycle them if it is a  metallurgical process, otherwise they auction as scrap..
  • This does not fall in PM space, but is an activity of Disposal related to MM and Finance.

 

 

Regards

KJogeswaraRao


Viewing all articles
Browse latest Browse all 2695

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>