Hi Ajay,
Thank you for the tips. As the material is mainly produced in AU plant so I selected Special Procurement Type as 80 (Production in alternative plant).
![Capture49.PNG]()
In the costing variant, I selected Transfer with Plant Change in Transfer Control. Is that correct ?
![Capture50.PNG]()
Regards,
Danny